Balcony Delay Fill

Community
Author
Nexus AV
Venue
O2 Academy Brixton
System
32x ViFORCE
Cabinets
ViFORCE

Hands the file to System Optimiser on this machine. The files themselves are below.

About this deployment

Delay-fill package for upper-tier coverage, time-aligned to the main system. Built against the O2 Academy Brixton room model in System Optimiser and validated on a 32x ViFORCE system.

What’s included

Every design in the database ships the same three parts, built together and checked against the room model:

  • System Optimiser prediction (.cvop) — the prediction, built against the venue’s verified room geometry.
  • LINUS Control project — routing, tuning groups and delay times as deployed.
  • Rigging plot and array angle sheet (PDF) — hang points, angles and load figures for the rigging crew.
Design bundle
Download all