Balcony Delay Fill
Community
- Author
- Nexus AV
- Venue
- O2 Academy Brixton
- System
- 32x ViFORCE
- Cabinets
- ViFORCE
Hands the file to System Optimiser on this machine. The files themselves are below.
About this deployment
Delay-fill package for upper-tier coverage, time-aligned to the main system. Built against the O2 Academy Brixton room model in System Optimiser and validated on a 32x ViFORCE system.
What’s included
Every design in the database ships the same three parts, built together and checked against the room model:
- System Optimiser prediction (.cvop) — the prediction, built against the venue’s verified room geometry.
- LINUS Control project — routing, tuning groups and delay times as deployed.
- Rigging plot and array angle sheet (PDF) — hang points, angles and load figures for the rigging crew.
Design bundle
Download all- System Optimiser prediction306 BSHA-2565bc7fcc93d8ca404cb2bc2836c8d6d6c4afa8222d0f962982ecff4f693242703
- LINUS Control project294 BSHA-256b35527735749c3d25fb9f8bef0f47a39d8621bf61a99d3b2704e42e874fee4e0
- Rigging plot291 BSHA-256967587a3aa6f847b0a8ba0e46c2848c9db874dfed7b8908b014513af52c89cc4
- checksums.txt245 BSHA-256a1b480659d4ad80a67ffdefcded74f14fa468349ea680d4f53aca02912ceb08d