Balcony Delay Fill
Community
- Author
- Nexus AV
- Venue
- Elbphilharmonie
- System
- 32x APS
- Cabinets
- APS
Hands the file to System Optimiser on this machine. The files themselves are below.
About this deployment
Delay-fill package for upper-tier coverage, time-aligned to the main system. Built against the Elbphilharmonie room model in System Optimiser and validated on a 32x APS system.
What’s included
Every design in the database ships the same three parts, built together and checked against the room model:
- System Optimiser prediction (.cvop) — the prediction, built against the venue’s verified room geometry.
- LINUS Control project — routing, tuning groups and delay times as deployed.
- Rigging plot and array angle sheet (PDF) — hang points, angles and load figures for the rigging crew.
Design bundle
Download all- System Optimiser prediction314 BSHA-256392280408368b761d863e1fa58048272224cbe123bb9fad4301adda1064e9d0c
- LINUS Control project302 BSHA-256df17b24995c744b1a7722837aadb9de2f088ffbea3dd4ffe707720f407fe33d2
- Rigging plot299 BSHA-25668fed0e98addae55be423c7166644c76de32963e419622bfed41c1900160188b
- checksums.txt245 BSHA-256f60d3cec2e5f4c7e5ed2dd882e8dbfaea8154b80d752328b88730f3a3e47eaec