Main System Design
OfficialMain and side hangs covering the bowl, with house delays and a subwoofer array, over the arena’s imported room geometry.
Main and side hangs, house delays and an HSA subwoofer arrayBy CODA Applications
Opens System Optimiser with the verified room model and no system loaded. The file is under Venue assets if you would rather download it.
An indoor arena on the north bank of the Clyde, part of the Scottish Event Campus. It opened in 2013 to a Foster + Partners design: a steeply raked horseshoe bowl around a flat floor, under a translucent skin. Capacity is 14,300 at its fullest configuration, and the room is routinely draped down to a fraction of that.