Balcony Delay Fill
Community
- Author
- Studio 9 Acoustics
- Venue
- Hollywood Bowl
- System
- 32x ViFORCE
- Cabinets
- ViFORCE
Hands the file to System Optimiser on this machine. The files themselves are below.
About this deployment
Delay-fill package for upper-tier coverage, time-aligned to the main system. Built against the Hollywood Bowl room model in System Optimiser and validated on a 32x ViFORCE system.
What’s included
Every design in the database ships the same three parts, built together and checked against the room model:
- System Optimiser prediction (.cvop) — the prediction, built against the venue’s verified room geometry.
- LINUS Control project — routing, tuning groups and delay times as deployed.
- Rigging plot and array angle sheet (PDF) — hang points, angles and load figures for the rigging crew.
Design bundle
Download all- System Optimiser prediction313 BSHA-25673290954f4717631af50cc6b1fdcaa453a38ad62d62f921e9fe1ed24458f37fd
- LINUS Control project301 BSHA-256fffe8b8dcced64dad4d52afa70441c5e5743702c186e2eea6505bf894e0bfb2b
- Rigging plot298 BSHA-2567b11e0c02b07251ac299ad95addbea4be1ad513166f11dc70e2799f54407246b
- checksums.txt245 BSHA-2562b1ec8c6a41114e30447ccb2ddc3d0bf91c9f22242e98ec7950554ec094650c8