Main FOH Reference
Official
- Author
- CODA Applications
- Venue
- Sziget Main Stage
- System
- 24x ViFORCE + 32x ViFRAME
- Cabinets
- ViFORCE, ViFRAME
Hands the file to System Optimiser on this machine. The files themselves are below.
About this deployment
Primary front-of-house design with main hangs and out-fills tuned to the verified room geometry. Built against the Sziget Main Stage room model in System Optimiser and validated on a 24x ViFORCE + 32x ViFRAME system.
What’s included
Every design in the database ships the same three parts, built together and checked against the room model:
- System Optimiser prediction (.cvop) — the prediction, built against the venue’s verified room geometry.
- LINUS Control project — routing, tuning groups and delay times as deployed.
- Rigging plot and array angle sheet (PDF) — hang points, angles and load figures for the rigging crew.
Design bundle
Download all- System Optimiser prediction305 BSHA-2567f8a5979ed4c407b94e36f9324ef2b3b2aa59d1ad321f06f7a66aaa83ee05a3e
- LINUS Control project293 BSHA-2566413b047d4dcf39342b3187358e6caf219ee36c2f4206b1151cf755828cd6d26
- Rigging plot290 BSHA-256638f9bc669f4d52d51727b46d077ca1674aa8d45b2fecd2ed55f4520a468ac0d
- checksums.txt245 BSHA-256a19d335fa78c85d171aa3b473e76d8352b1f4d34b45a31d5342e54fed2a82fe8